TEMPORARY BRIDGE (RUSSIA)

Parent Category: Gallery

Over water construction sites access systems

(2011-2016) Working design of steel structures and prefabricated concrete slab runway, erection working design for bridge flying over the sea, 11 km length 6 m wide, span length 12 m, working platform and technological island for casting foundations and piers.